The Beale project consisted of construction or replacement of:
Argus developed a cost savings plan evaluation to construct a temporary JPTS receipt, storage and dispensing facility. This was achieved by using portions of the abandoned JP-7 fuel system and the existing JP-TS system. An optimized plan was produced to increase the efficiency of construction, resulting in reduced project costs.