Las Vegas McCarran International Airport, Nevada
Multiple New Aircraft Hydrant Fueling Systems and Modifications
Las Vegas McCarran International Airport, Nevada Multiple New Aircraft Hydrant Fueling Systems and Modifications
  • Type of Services
    Planning, Design and Construction Follow-On

  • Project Location
    Las Vegas McCarran International Airport, Nevada

  • Client
    LASFUELS

With the growth of LAS during the past four years, Argus Consulting has been involved with a multitude of projects that have focused on the expansion of the LAS Aircraft Hydrant Fueling Systems. At Terminal 1, Argus designed hydrant systems for complete rebuilding of the hydrant systems at CB-2 and CB-4 Concourses. Also at Terminal 1, gate modifications were made on the C-Gates. For Terminal 2, also known as the International Terminal, Argus performed gate modifications.

Argus provided planning and hydrant system design services for Terminal 3 and the Northwest Concourse of Terminal 3. In addition to the individual hydrant systems, Argus provided planning and design services for a new fuel distribution supply main connecting the Fuel Storage Facility to Terminal 3.

The new 20-inch distribution supply line to Terminal 3 designed provides a bi-directional feed around the entire Passenger Terminal Complex. The addition of this line provides a redundant and bi-directional source of fuel for the entire Passenger Terminal Complex.

Most recently, Argus is serving as Client Representative to Southwest Airlines for the Planning and Programming of the tank farm at Las Vegas. We are also working on the investigation and commissioning of the existing control system and upgrade of the EFSO system.