

Argus provided comprehensive planning, detailed design and complete construction administration services for a new fuel receiving, storage and distribution facility, 20-inch transmission line and a 31-gate aircraft hydrant fueling system. Argus provided full-time resident engineering services during construction. The major elements of this new facility included:
Argus successfully constructed the new facility on the same site, while keeping the existing facility in constant operation.