Argus Consulting, Inc.

Dallas/Ft. Worth International Airport (DFW)

Planning, Programming and Design Services

Multiple Gate Modifications
American Airlines hired Argus to provide planning, design and construction follow-on engineering services for multiple hydrant system projects at DFW and are driven by A/A's growing fleet of larger aircraft including the B-777. The projects have included multiple gate modifications at Terminals 2E, 3E, 4E and 2W.

Additional Hydrant System
In addition to the A/A projects, the DFW Airport Board has hired Argus to design a new hydrant system for a Connector Building between Terminal 2W and future 3W. These projects required careful planning to minimize gate closure periods.

Use your browser's "Back" button to return to the Client List.

Home | About Argus | Philosophy
Services | Clients | News | Contact Us