Argus Consulting, Inc.

San Diego International Airport (SAN)

Construction Management

Argus was retained by the San Diego Airlines Fuel Committee to provide consulting and construction management services for the new aircraft fuel receiving, storage and distribution facility at Lindbergh Field - San Diego International Airport.

Project Elements
The project included: six over-the-road transport truck unloading positions, two - 1,000,000 gallon aboveground fuel storage tanks, and six remote refueler loading positions. One unique element of this project is 2,000 feet of 10-inch double wall jet fuel piping installed in a 44-inch utility casement passing under the main runway/taxiway system. This casement connects the fuel storage facility to the remote refueler area.

Argus Expertise
Specialized expertise from Argus included: a partnering workshop, participation in project coordination meetings, technical assessments and recommendations, periodic field investigations, conformation of code and regulatory compliance, final inspection for beneficial occupancy and assistance in start-up and testing and flushing.

Use your browser's "Back" button to return to the Client List.

Home | About Argus | Philosophy
Services | Clients | News | Contact Us